  4.4 Reorder level
  The re-order level is the level of stockholding at which a fresh order is placed with a supplier.
  Re-order level = maximum supply lead time (in days or weeks) maximum daily or weekly demand for the item.
 
  Example :
  The daily demand for stock item is expected to be not less than 60 tons and not more than 100 tons. The lead time between placing an order and receiving delivery from the supplier will be between one and three days. What should be the re-order level?
 
  Solution:
  Minimum demand = 60 Maximum demand = 100
  Minimum lead time = 1 days Maximum lead time = 3 days
  Reorder level = 100 tons x 3 days = 300 tons
 
  What stock control system to use?
  Minimum stock level
  The minimum stock level for an item of stock is a warning level.
  Minimum stock level = re-order level – (average demand for the item each day/month x average length of lead time in days/months)
 
  Maximum stock level
  The maximum stock level is a stock level that should never be exceeded.
  Maximum stock level = reorder level + reorder quantity – (minimum usage per day x Minimum lead time per order)
 
  高頓網(wǎng)校小編寄語:羨慕別人得到的,不如珍惜自己擁有的。

   ACCA官方微信    
  掃一掃微信,*9時(shí)間獲取2014年ACCA考試報(bào)名時(shí)間和考試時(shí)間提醒
  
  高頓網(wǎng)校特別提醒:已經(jīng)報(bào)名2014年ACCA考試的考生可按照復(fù)習(xí)計(jì)劃有效進(jìn)行!另外,高頓網(wǎng)校2014年ACCA考試輔導(dǎo)高清課程已經(jīng)開通,通過針對性地講解、訓(xùn)練、答疑、???,對學(xué)習(xí)過程進(jìn)行全程跟蹤、分析、指導(dǎo),可以幫助考生全面提升備考效果。
  
  報(bào)考指南:2014年ACCA考試備考指南
  免費(fèi)題庫:2014年ACCA考試免費(fèi)題庫
  考前沖刺:ACCA備考秘籍
  高清網(wǎng)課:ACCA考試網(wǎng)絡(luò)課程